UK Decs

  • Home
  • About UK Decs
  • Service & Capabilities
  • Our Work
  • Clients & Testimonials
  • Blog
  • Contact

Hammersmith Apollo

October 18, 2017 by Editor

  • London’s Hammersmith Apollo is a world famous venue having hosted the likes of the Beatles and David Bowie
  • As a Grade II listed building, English Heritage was involved throughout the work
  • Our involvement included extensive refurbishment work including interior and exterior painting
  • The 12 week, £35k project came in on time and on budget
Hammersmith
Hammersmith
Hammersmith
Hammersmith

Filed Under: Our Work

Andy Waters Restaurants

October 17, 2017 by Editor

We have completed work on the Andy Waters Restaurants, painting the whole interior of the restaurant.

Andy Waters Andy Waters Andy Waters Andy Waters

Filed Under: Our Work

Victoria Gate Casino

October 16, 2017 by Editor

  • Our work on this exciting, new build casino included several specialist services including:
  • Specialist, wide vinyl wall coverings
  • Hanging a large mural
  • Wallpapering a circular hub
  • Spraying individual ceiling tiles different colours
  • We also added mirrored paint above the 6m high bar, to give the illusion that the bar extends all the way to the ceiling
Victoria Gate
Victoria Gate
Victoria Gate
Victoria Gate

Filed Under: Our Work

Total Fitness

October 4, 2017 by Editor

  • We completed extensive works on the Total Fitness gym facilities, including painting the pool area and car park
  • Surfaces were stripped, primed and treated with intumescent paint before the top coat was applied
  • Specialist paint was also used for the wet and corrosive environment
  • Scaffolding access was required and we provided PASMA trained contractors

Total FitnessTotal FitnessTotal Fitness

Filed Under: Our Work

The Red Rock Development

October 4, 2017 by Editor

  • The Redrock complex in Stockport includes a Light Cinema and several restaurants
  • The £60k+ project was a full refurbishment of the cinema; starting from an empty shell we helped to transform the building into a state of the art cinema
  • We completed the full fit out and used intumescent paint as per health and safety

Filed Under: Our Work

Piccadilly Gate

October 3, 2017 by Editor

  • Piccadilly Gate is a 125,000 sq ft office space in Manchester
  • In this £40k+ renovation project we used a variety of specialist tools and techniques, such as spider equipment to paint
  • As the building was in constant use throughout the day, we completed the work at night to minimise disruption

Filed Under: Our Work

Hollywood Bowl

October 3, 2017 by Editor

  • We have a long-standing relationship with Hollywood Bowl, having worked at many of their venues across the country
  • This project was completed on time and on budget and involved repainting the whole inside of the building, including:
  • Spraying the ceilings
  • Painting Chevrons
  • We also hung artist graphics on the walls
Hollywood Bowl
Hollywood Bowl
Hollywood Bowl
Hollywood Bowl

Filed Under: Our Work

Contact UK Decs





Units 5 & 6 Alma Works,
Cavendish Street,
Ashton-Under-Lyne,
OL6 7QL

Telephone: 01457 837600
Email: office@ukdecs.co.uk

Registered Office

Units 5 & 6 Alma Works,
Cavendish Street,
Ashton-Under-Lyne,
OL6 7QL

Co Reg: 08493444
VAT Number 161053740

  • About UK Decs
  • Our Work
  • Service & Capabilities
  • Clients & Testimonials
  • Blog
  • Contact
  • Privacy Policy

© 2025 · UK Decs · Website by AsOne